Is it reinforced?
Concrete Breaking South Africa helps you find the best quote, fast. It takes out slabs, footings, bases and structures that a machine cannot dig. The method follows the reinforcement: a hammer for mass concrete, a saw where the cut has to be clean, a splitter where noise and vibration rule the hammer out. Say what the structure is and get quotations to compare.
Super easy & fast
- Know what breaking a cubic metre of concrete should cost, so you never pay too much.
- Send the same structure to several contractors, and quotes come back fast.
- From LEADERR APPROVED providers, vetted and backed by many verified 5-star reviews. Peace of mind that a structure is checked before anything is cut out of it.
Concrete Breaking Prices
Ballpark figures so you can check a quotation.
| Item | Ballpark price |
|---|---|
| Breaking mass concrete, per cubic metre | R450 - R1,100 |
| Breaking reinforced concrete, per cubic metre | R750 - R1,900 |
| Breaking a slab, per square metre, up to 150mm | R120 - R320 |
| Breaking a slab, per square metre, 200 to 300mm | R280 - R650 |
| Diamond sawing, per square metre of cut face | R650 - R1,800 |
| Removal of rubble, per cubic metre | R280 - R650 |
| Machine and operator, per day, confined site | R4,500 - R9,500 |
| Typical 60 square metre driveway slab | R12,000 - R30,000 |
Prices JUST UPDATED. Ballpark figures, rounded, excluding VAT. They reflect typical South African rock blasting, breaking and excavation rates. They are not our prices or quotations, and no provider is bound by them. Rock work is quoted on MEASURED VOLUME, and how much rock there is can only be estimated until the face is opened, so confirm what each quotation includes, such as mobilisation, whether the rate is on volume in the ground or loose, and who removes the broken rock.
Say what the structure is and how thick it is, and get concrete breaking quotes.
Get the Best QuoteClient Reviews
Powered by leaderr
Picking the Method
- Hydraulic hammer. Fastest and cheapest for mass concrete and anything with room to work.
- Diamond saw. Where the remaining structure has to be left with a clean sound edge.
- Wire saw. For thick sections and deep cuts a disc cannot reach through.
- Hydraulic splitter. Where noise and vibration rule a hammer out and the steel is light.
- Crunchers and pulverisers. For separating concrete from reinforcement on a demolition.
Reinforcement Changes the Price
- Mass concrete breaks fastest. Nothing holds the pieces together once they crack.
- Light mesh is manageable. Cut as it is exposed, which adds time rather than method.
- Heavy bar needs cutting. The concrete comes off and the cage still has to be cut out and removed.
- Post tensioned slabs are different work. Tendons are under load and releasing them is specialist work.
- Say what you know. Old drawings change the quote more than a site photograph does.
When the Structure Has to Stay Up
- Check it before you cut. A slab, a beam or a column being altered needs an engineer's view first.
- Saw rather than hammer. Cutting avoids shaking the part of the structure you are keeping.
- Support before removing. Propping goes in before load is taken off something, not after.
- Plan how pieces come out. A sawn block has to be lifted, and its weight decides the plant.
- Protect what is below. Dust, water and falling material reach further than people expect.
Get a price for your own structure rather than a range.
Get the Best QuoteWhat Affects the Price
- Thickness and volume. Cubic metres drive the cost once the method is chosen.
- How much reinforcement there is. The difference between mass and heavily reinforced concrete is large.
- Whether the cut has to be clean. Sawing costs several times what hammering does.
- Access for a machine. Hand work or a mini machine is far slower than an excavator and hammer.
- Whether the structure stays in use. Working around live operations limits the hours and the method.
- Rubble removal. Broken concrete is heavy and the disposal cost is real.
- Noise and dust restrictions. They can push the job to sawing or to limited working hours.
What to Include in Your Request
- The address. Suburb and town, so a contractor knows whether they work there.
- What the structure is. Slab, footing, base, retaining wall, column or whole structure.
- Dimensions and thickness. Area and depth, even approximately.
- What you know about the steel. Mesh, bar, or old drawings if you have them.
- What stays and what goes. Whether anything around it has to remain standing and sound.
- Whether you want the rubble removed. Breaking only, or breaking plus carting away.
Before You Appoint a Contractor
- Has an engineer looked at it? Essential on anything structural, and worth it on anything you are unsure about.
- Is rubble removal in or out? It is often a third of the cost and it is often excluded.
- What happens if the steel is heavier than assumed? Agree the mechanism before it is discovered.
- Is dust and water control included? Sawing uses a lot of water and it has to go somewhere.
- Is the slab post tensioned? If nobody knows, find out before anyone cuts it.
- What are the working hours? Breaking is loud and in a built up area the day is usually shorter than you think.
Concrete Breaking FAQs
How much does it cost to break up a concrete slab?
For a slab up to 150mm thick, roughly R120 to R320 a square metre. At 200 to 300mm it is more like R280 to R650. Removing the rubble is usually quoted separately and on a thick slab it can match the breaking.
Does reinforcement make much difference?
A lot. Mass concrete breaks and falls apart. Reinforced concrete breaks and stays hanging together on the bars, which then have to be cut out and handled. Expect roughly half again to double the rate for heavily reinforced work.
When should concrete be sawn rather than broken?
Whenever the structure you are keeping has to be left sound. A hammer cracks beyond the line you are working to; a saw leaves a clean edge. Sawing costs several times more a square metre, which is why it is used for the cut and a hammer for the rest.
Can a slab be broken inside a building?
Yes, with a mini excavator or hand held breakers, and the practical limits are floor loading, headroom, dust, noise and getting the rubble out. On upper floors the weight of the machine and of the accumulated rubble is the thing to check first.
What is post tensioned concrete and why does it matter?
A slab with steel tendons tensioned after casting. Cutting a tendon releases stored energy and it is dangerous work for anyone who is not expecting it. If a slab might be post tensioned, establish it before anybody cuts, from drawings or a scan.
Who is responsible for checking the structure?
You are, as the client, unless the contract says otherwise. A breaking contractor prices the breaking. Whether the remaining structure is safe once a piece is removed is an engineering question and it should be answered before the quote is accepted.
Method decides the price here more than volume does, which is why contractors on Rock Blasting are worth comparing on what they propose to use.