Rock Splitting South Africa helps you find the best quote, fast. It cracks rock with a hydraulic wedge driven into a drilled hole. There is no blast, almost no vibration and very little noise, and the splitter is small enough to be carried where no machine fits. It is slow and it suits small volumes. Say how much rock there is and get quotations to compare.
Super easy & fast
- Know what splitting should cost a cubic metre, so you never pay too much.
- Send the same access constraints to several contractors, and quotes come back fast.
- From LEADERR APPROVED providers, vetted and backed by many verified 5-star reviews. Peace of mind that a silent method still comes with a proper method statement.
Rock Splitting Prices
Ballpark figures so you can check a quotation.
| Item | Ballpark price |
|---|---|
| Hydraulic rock splitting, per cubic metre | R900 - R2,500 |
| Splitting mass concrete, per cubic metre | R1,100 - R3,200 |
| Drilling for splitter, per metre | R180 - R420 |
| Splitter and operator, per day | R5,500 - R14,000 |
| Two man team with compressor, per day | R8,500 - R20,000 |
| Removal of split material, per cubic metre | R280 - R650 |
| Callout and setup, within a metro | R2,500 - R7,500 |
| Typical 15 cubic metre lift pit | R22,000 - R55,000 |
Prices JUST UPDATED. Ballpark figures, rounded, excluding VAT. They reflect typical South African rock blasting, breaking and excavation rates. They are not our prices or quotations, and no provider is bound by them. Rock work is quoted on MEASURED VOLUME, and how much rock there is can only be estimated until the face is opened, so confirm what each quotation includes, such as mobilisation, whether the rate is on volume in the ground or loose, and who removes the broken rock.
Say how much rock there is and how tight the access is, and get rock splitting quotes.
Get the Best QuoteClient Reviews
Powered by leaderr
What a Splitter Does Well
- Works where nothing else fits. A lift pit, a light well, a basement or inside a finished building.
- No vibration worth measuring. Which is why it is chosen next to heritage walls and sensitive equipment.
- Near silent. The drilling makes the noise. The splitting itself is quiet.
- Predictable direction. Holes are placed so the rock breaks toward a free face, where you want it.
- No permit. Nothing explosive is involved, so none of the permit timeline applies.
What It Does Not Do
- Volume. Tens of cubic metres is its range. Hundreds is not.
- Work without a free face. Rock has to have somewhere to move. The first cut is always the slowest.
- Heavily reinforced concrete. It cracks the concrete and the bars still hold it together.
- Highly fractured rock. The wedge opens an existing joint instead of making a useful break.
- Remove the rock. It splits it. Lifting and carting away is separate work.
How It Compares on a Confined Site
- Against a breaker. Slower, but silent and without the continuous shaking a hammer produces.
- Against chemical breaking. Faster, because there is no waiting for a reaction, and reusable.
- Against blasting. No permit, no exclusion zone, no neighbours to notify, and a far higher rate.
- Often combined. Chemical grout to open the first crack, a splitter to work the face after.
- Pick by the free face. If there is nowhere for the rock to go, nothing works well until a first cut is made.
Get a price for your own site rather than a range.
Get the Best QuoteWhat Affects the Price
- Volume of rock. Every cubic metre takes its own holes, so cost rises almost in a straight line.
- Access. Carrying gear down stairs or through a building is most of the time on a small job.
- Whether there is a free face. The first cut on a confined rock mass is the slowest and dearest part.
- Rock type and jointing. Sound rock splits cleanly. Fractured rock wastes holes.
- Whether power and water are available. A generator and a water bowser add cost and setup.
- Noise and hours restrictions. They limit the drilling, which is the noisy half.
- Whether the material is removed. Splitting leaves it in place by design.
What to Include in Your Request
- The address. Suburb and town, so a contractor knows whether they work there.
- The volume. Length, width and depth of the rock or concrete, even roughly.
- The access. Doorway and stair widths, headroom, and how far from the street.
- Why a machine cannot be used. Access, vibration, noise or the floor loading.
- Whether power and water are on site. It changes what has to be brought in.
- Whether you want it removed. Splitting only, or splitting plus carting it out.
Questions That Change the Number
- Is there a free face to work to? The honest answer changes the programme more than the volume does.
- Is the drilling included? Splitting is priced per cubic metre; the holes are sometimes separate.
- Who carries the material out? On a basement job, carrying it out can cost more than splitting it.
- Is there a minimum charge? On a small volume the setup is the price.
- Would a breaker be allowed here? If it would, it is usually cheaper. Ask the question openly.
- How many days is the quote based on? A day rate without a volume attached is not comparable.
Rock Splitting FAQs
What does hydraulic rock splitting cost?
Roughly R900 to R2,500 a cubic metre. It sits between mechanical breaking and chemical rock breaking on price, and it is chosen for the same reasons as the chemical method: no permit, no vibration and access a machine cannot manage.
Is it faster than expanding grout?
Yes, because there is no waiting for a chemical reaction. A splitter works the hole immediately and moves to the next one. Grout can be poured into many holes at once and left overnight, so on a big enough face grout can still win on total time.
Does it work on reinforced concrete?
It cracks the concrete but the reinforcement holds the pieces together, so it is normally combined with cutting the bars. For mass concrete with little steel it works well, and for a heavily reinforced slab a saw and a breaker are usually better.
How much rock can be split in a day?
On accessible rock with a free face, a two person team might take out 3 to 8 cubic metres a day. Working the first cut into a confined rock mass, or carrying gear down into a basement, can halve that.
Is it vibration free?
The splitting produces nothing a neighbour would feel and nothing a seismograph would flag. The drilling produces some, in the same way as any percussive drill. On genuinely sensitive sites the drilling is what gets managed.
Can it replace blasting on a big job?
Not economically. Above roughly a hundred cubic metres the cost becomes hard to justify against blasting or mechanical breaking. It is a method for places where those two are not available, not a general substitute.
Access and free face shape this work more than volume does, so contractors on Rock Blasting are worth comparing on how they plan the first cut.