Is it inside a building?
Hand Drilling South Africa helps you find the best quote, fast. It is drilling and breaking with hand held equipment where no rig can stand and no excavator can reach. It covers basements, light wells, roof slabs, steep ground and heritage sites, and it is the method most often paired with splitting or chemical breaking. Say where the work is and get quotations.
Super easy & fast
- Know what a hand drilling team should cost a day, so you never pay too much.
- Send the same access constraints to several contractors, and quotes come back fast.
- From LEADERR APPROVED providers, vetted and backed by many verified 5-star reviews. Peace of mind that the crew on a confined site is working to a method statement.
Hand Drilling Prices
Ballpark figures so you can check a quotation.
| Item | Ballpark price |
|---|---|
| Two man team with compressor, per day | R4,500 - R11,000 |
| Four man team with compressor, per day | R8,500 - R20,000 |
| Hand drilling, per metre drilled | R220 - R550 |
| Jackhammer breaking, per cubic metre | R850 - R2,400 |
| Compressor hire, per day | R1,400 - R3,800 |
| Carrying material out by hand, per cubic metre | R450 - R1,200 |
| Callout and setup, within a metro | R2,500 - R7,500 |
| Typical lift pit deepened by hand, 8 cubic metres | R28,000 - R70,000 |
Prices JUST UPDATED. Ballpark figures, rounded, excluding VAT. They reflect typical South African rock blasting, breaking and excavation rates. They are not our prices or quotations, and no provider is bound by them. Rock work is quoted on MEASURED VOLUME, and how much rock there is can only be estimated until the face is opened, so confirm what each quotation includes, such as mobilisation, whether the rate is on volume in the ground or loose, and who removes the broken rock.
Say where the work is and why a machine cannot be used, and get hand drilling quotes.
Get the Best QuoteClient Reviews
Powered by leaderr
Where Hand Work Is the Only Option
- Basements and lift pits. No headroom for a machine and no way to get one down there.
- Inside finished buildings. Where floor loading or finishes rule plant out.
- Steep or unstable ground. Where a rig cannot be set up safely on a slope.
- Heritage structures. Where vibration and the risk of over break matter more than speed.
- Beside live services. Where the work has to be done carefully by feel rather than quickly.
How It Is Priced
- By the day, most often. A team and a compressor, with a stated number of working hours.
- By the metre, for drilling. Where the scope is a known number of holes for a splitter or grout.
- By the cubic metre, for breaking. Where the volume is measurable and the access is understood.
- Plus getting the material out. On a basement job this is frequently the largest single item.
- Plus the compressor. Sometimes separate, sometimes bundled. Check which.
What Slows a Hand Crew Down
- Carry distance. Every metre between the work and the street is paid for twice.
- Ventilation. Confined spaces need air moved, and that limits how long a shift can run.
- Dust and water control. Required indoors and it adds time to every hour.
- Noise windows. In occupied buildings the working day is often half what it looks.
- Rock hardness. A hand held tool in hard rock produces very little, very slowly.
Get a price for your own access rather than a range.
Get the Best QuoteWhat Affects the Price
- Access and carry distance. The dominant cost on most hand drilling jobs.
- Volume of rock or concrete. Hand work is priced by the day, so volume becomes days.
- Rock hardness. It changes daily output more here than with any machine method.
- Headroom and working space. A crew that cannot stand up works at a fraction of normal pace.
- Whether services and power are available. A generator and a water supply have to come in otherwise.
- Working hours. Occupied buildings and residential noise rules both shorten the day.
- Whether material has to be carried out. By hand, in bags or barrows, which is slow by nature.
What to Include in Your Request
- The address. Suburb and town, so a contractor knows whether they work there.
- Why a machine cannot be used. Access, floor loading, vibration or noise.
- The access route. Stairs, doorway widths, headroom and distance from the street.
- The volume. Dimensions of the rock or concrete to be taken out.
- Whether power, water and air are available. It changes what has to be brought in.
- Working hours. Especially in an occupied or residential building.
Before You Appoint a Contractor
- Is the compressor in the day rate? It is a meaningful amount either way.
- How many working hours is a day? Eight, or six with travel, changes the comparison.
- Who carries the material out? On a basement this is often the biggest item in the job.
- Is ventilation provided? A confined space needs it, and it is a safety requirement rather than a comfort.
- Is dust and water control included? Indoors it is not optional and it takes time.
- Would splitting or grout be faster? Often a combination beats hand breaking on its own.
Hand Drilling FAQs
What does a hand drilling team cost per day?
Roughly R4,500 to R11,000 a day for two people and a compressor, and R8,500 to R20,000 for a four person team. The compressor is sometimes a separate line at R1,400 to R3,800 a day, so check which basis a quote is on.
How much can a hand crew break in a day?
In concrete or weathered rock, perhaps 1 to 4 cubic metres a day for a two person team. In hard unweathered rock it can be well under one. That spread is why a day rate on hard rock needs a realistic estimate of days attached to it.
Why is it so much more expensive than machine work?
Because the output per hour is a small fraction of a machine's. You are not paying more per hour, you are paying for far fewer cubic metres per hour. It is chosen where a machine cannot go, not where a machine would be allowed.
Is hand drilling used with blasting?
Yes. On sensitive sites a hand crew drills small diameter holes to a tight pattern, and those holes are then charged with very small charges, split hydraulically or filled with expanding grout. The drilling method and the breaking method are separate choices.
Can it be done in an occupied building?
It is done regularly, and the constraints are noise windows, dust containment, ventilation and protecting finishes on the route out. Expect the working day to be shorter than normal and the programme to be longer than the volume suggests.
Who carries the broken material out?
It should be stated in the quote, because on a basement or a lift pit it is frequently the largest item in the job. Material comes out in barrows or bags, up the same stairs the crew came down, and it is slow work however it is priced.
Access is what prices this work, so describing it once to several contractors on Rock Blasting saves repeating the same site walk over and over.